Wayne came over today to help out with the layout. Yup, at long last we're working on the layout again. We got the benchwork for the entire UP loop completed. We re-worked Sullivan's Curve and finalized the grade at Silverwood. I need to get 5 rolls of the WS Plaster Cloth, 2 Large Right Turnouts, 1 Large Left Turnout, 15 pieces of cork, 13 pieces of Peco Code 80 Concrete Tie flex track, and 10 pieces of Atlas Code 100 Flex Track. Sherry has suggested a new wall to create a laundry room, which led to Wayne's suggestion of widening the layout at Alray. Damn! Another project!

0 comments:

Post a Comment