Wayne came over today to help out with the layout. Yup, at long last
we're working on the layout again. We got the benchwork for the entire
UP loop completed. We re-worked Sullivan's Curve and finalized the grade
at Silverwood. I need to get 5 rolls of the WS Plaster Cloth, 2 Large
Right Turnouts, 1 Large Left Turnout, 15 pieces of cork, 13 pieces of
Peco Code 80 Concrete Tie flex track, and 10 pieces of Atlas Code 100
Flex Track. Sherry has suggested a new wall to create a laundry room,
which led to Wayne's suggestion of widening the layout at Alray. Damn!
Another project!
Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment