Demolition Day

Today was the last day of the Cajon layout. It went fairly well, but I have a cut on my forehead from a snag on a nail, and a sore back for my troubles.

The rubble filled the bed of my truck and six large trash bags. Of course not everything is heading for the landfill, but the lumber, foam, cork and track is gone from Devore to Summit.

That area of the layout is now going to be a 3'x12' workbench with cupboards and pegboard under the worktop. The area on the other side of the garage is going to be a 4'x20' layout with a connection to the Free-moN modules.

0 comments:

Post a Comment