Wayne got me a great little ATSF MoW gondola, plus I've got some other MoW cars. I've been thinking about getting an MoW track cleaning car and putting together a Maintenance of Way train to keep at Cajon and bring out for track cleaning.
On Saturday night, Wayne and his wife, plus Drew and his family came
over for dinner. It was a great chance to thank them for the hard work
on the layout. It was also a great chance to start laying tack! We got
the entire UP Blue Cut power district laid. I hooked it up to the power
bus on Monday and ran a train through the district. Last night, I got
industrious after work and laid the track in the UP Dike district,
meaning that as of right now, half the UP tracks are down and working.
If I can hurry, maybe I'll have my Union Pacific tracks completed for my
own May 10th GREAT EVENT!
Wayne got me a great little ATSF MoW gondola, plus I've got some other MoW cars. I've been thinking about getting an MoW track cleaning car and putting together a Maintenance of Way train to keep at Cajon and bring out for track cleaning.
Wayne got me a great little ATSF MoW gondola, plus I've got some other MoW cars. I've been thinking about getting an MoW track cleaning car and putting together a Maintenance of Way train to keep at Cajon and bring out for track cleaning.
Today was a "mental health" day from work. Too many hours on the job and
not enough hours slacking off. Wayne and Drew were over and once again,
we got a lot done. The bus wires are in for the U.P. tracks, the foam
has a coat of drywall mud and mesh, the backdrop at Morman Rocks is
going up, and there is a new peg board for some tools. In the afternoon,
Wayne and I headed over to Longs and TrainQuest where I bought two
boxes of cork, the code 100 track for the hidden U.P. tracks, rail
joiners, etc.
Wayne and I did another recon trip up to the Pass today. I took four
pages of notes and Wayne shot at least a CD full of photos. It was
interesting to see someone else look at the Pass with a critical eye
towards modeling the area. Usualy when I go railfanning, everyone else
is concentrating on the trains. I'm the only one looking at signals,
culverts, etc. I'm so glad Wayne is now comfortable enough with the
layout that he can look at the Pass with that same eye and thought
process.
In no particular order, here are some of the notes from today's trip:
In no particular order, here are some of the notes from today's trip:
- The freeway bridge at Devore is actually two bridges, one in each direction.
- It would be nice to add at least a ranch or two on the hillside by Keenbrook.
- Bee hive boxes in the creek bottom, under Sycamores.
- There are at least three culverts between the freeway and Blue Cut.
- The culverts always line up with a gully or canyon above.
- The connecting canyons all face downstream.
- In a few places there is a corrugated steel debris screen uphill of the tracks.
- A few higher areas have pockets of Coulter Pines.
- High power lines are rail brown.
- Curved creek bank before Blue Cut has rail fence and oxidized rip-rap.
- Power lines are directly above the Blue Cut viaduct.
- The BC Viaduct is 32' tall, 80' long and double track wide.
- The opening is 20' high and wide, but 20' from the downhill side.
- There is a cool cut-stone wall extending from the uphill side.
- There is a 6' I-beam and wood retaining wall between Swarthout Road and the BNSF tracks.
- Many of the signals and boxes are painted a fleshy tan color.
- There are several enclosed culverts running from the UP tracks to the BNSF tracks before Cajon Station.
- There is a 6' flood wall on the creek side of Cajon Station.
- The entire crossover between the signals at Summit is wood ties.
- The BO tracks at Summit have wood ties.
- The grade crossing at Summit Guard shack is cement.
- The security lamps at Summit are on the top of wood poles, with white insulators and three wires.
Wayne came over today to help out with the layout. Yup, at long last
we're working on the layout again. We got the benchwork for the entire
UP loop completed. We re-worked Sullivan's Curve and finalized the grade
at Silverwood. I need to get 5 rolls of the WS Plaster Cloth, 2 Large
Right Turnouts, 1 Large Left Turnout, 15 pieces of cork, 13 pieces of
Peco Code 80 Concrete Tie flex track, and 10 pieces of Atlas Code 100
Flex Track. Sherry has suggested a new wall to create a laundry room,
which led to Wayne's suggestion of widening the layout at Alray. Damn!
Another project!
So the cop traffic jam scene is a little stereotypical, but being a fan of urban layouts, The Acela Express
is a winner. The work around the house has progressed at a break neck
pace. We're almost ready for the gunite on the pool, but before the deck
goes in, I want to run the irrigation, plus conduit for low-voltage
lighting and garden speakers.
Alright. Time to come clean. I haven't worked on the layout since
February 12th. In the interim, I've fought off at least one virus,
installed new toilets, built a fence, moved the door on the tool shed
from the north wall to the east wall, put new hardware on the kitchen
cabinets, and supervised the digging for our new swimming pool. Sherry
tells me this weekend will be spent putting in crown molding in the
master bath. It may be another week before I get to play trains.
Well, as predicted, the counter rolled over to 10,000 yesterday. The
honor of clicking that one over goes to John Quinn. Stuart Chirls was
disappointed to have made 10,001. I promise to give him some warning
when I get close to 25,000.
On Saturday, I headed over to the Model Train Expo with Wayne, Mario and Roy. Later we ran into Hugo at the show. Mario spent at least a grand on G Scale stuff. Just a few years ago, the shows were about 5% G Scale. Now it is at least 50% G scale.
On Saturday, I headed over to the Model Train Expo with Wayne, Mario and Roy. Later we ran into Hugo at the show. Mario spent at least a grand on G Scale stuff. Just a few years ago, the shows were about 5% G Scale. Now it is at least 50% G scale.
Subscribe to:
Posts (Atom)

